Automatic Outage: Radials older than 12 hours. Operator should investigate.
Status switched to 'In Progress'
2024-09-15 17:00:52 GMT seasonde (TT, LW, RG) Due to USACE, US NPS, US Navy, US CG Site soil remediation, site will be down for local work. Site taken offline at 10:00AM EST/14:00 UTC. Tx cables coiled and placed at base of antennas. Rx cables coiled and placed at base of hut. Rx antenna taken down and placed near hut. All cable connectors weatherproofed. Awaiting further word from NPS.
2025-04-03 19:24:35 GMT seasonde (TT, MM, LW, JW, RG) Re-installing HATY at the new southern location. New Rx bearing is 116 deg. Reflected power is high, so we are leaving it off until we return tomorrow (Friday). We forgot ground plane wires for the Tx and will install them and check reflection after. 2025-04-04 16:18:51 GMT seasonde (TT, RG, MM) Finished site setup. Ground plane wires and tuner corrected the reflected power. Slight noise on Rx1 but otherwise looking good.
Status switched to 'Closed'